Before submitting your renovation application, please review the renovation categories here: https://help.morethanstrata.com.au/hc/en-au/articles/52808571615129
For example: SP12345. If you're unsure, check your levy notice or strata records.
Your lot or unit number in the building.
Name of the registered lot owner.
Tell us whether you are the lot owner, or a managing agent acting for the owner.
We'll use this email to send updates about your application.
Optional, but helpful if we need to clarify anything quickly.
If you are unsure, choose “Not sure” and describe your works in detail below. We'll confirm the correct category for you.
Please select all that apply. You can provide more detail in the description field above.
When do you expect the renovation works to start?
For example: 2 weeks, 10 working days, etc.
For example: Monday–Friday, 8:00am to 5:00pm.
Please include: • how materials will be moved in and out (lifts, stairs, loading dock) • whether any materials or skip bins will be on common property and where • how dust and dirt will be managed and how common property will be cleaned • what steps will be taken to minimize false fire alarm activations.
For example: hallway walls, foyer ceiling, balcony slab, external walls, roof space, services risers, etc.
For example: NSW Contractor License 123456C – Builder / Plumber / Electrician.
Required if you are installing hard flooring. Please upload any acoustic test reports or manufacturer data sheets that show the acoustic rating of the proposed flooring/underlay system.
Required if your works involve structural changes or removal of load-bearing walls. Upload any engineer reports or certificates you have obtained.
Upload any plans, sketches, quotes, scope of works or specifications that will help us understand your proposal. For solar installations, this may include roof layout drawings, panel locations and system specifications.
Upload any other relevant documents (for example: waterproofing details, additional photos, reports or certificates).